Traffic Advisory - Bridge Repairs/Closures

bridge repairs
Lockwood Lane, Boxford   
Bridge Closure - Lockwood Lane over I-95   
MA-DOT and the prime contractor are proposing a closure of the Lockwood Lane Bridge over 95 beginning June 26th. The duration of the closure is unknown due to the fact that the deterioration of the bridge deck is currently unknown until the pavement is removed and the engineers perform their inspections. During the closure there will be an active detour. A map of the detour route can be found in the attachments below. Please proceed with caution and adjust your schedule for any impacts the detour will cause.   MassDOT Advisory - click HERE
 
Bare Hill Road, Boxford - Postponed until next year
Bridge Closure - Bare Hill Road over I-95
 
Though this is a state administered contract, the town will update this page periodically with milestones and information that is relevant.  Please check back or call the DPW with questions, at 978-352-6555.
 
Uptack Road, Groveland
Bridge Closure - Uptack Road, Groveland starting June 16, 2023.
For more information and detour routes, please follow this link. https://grovelandma.com/news/