Georgetown South BtoB rail trail project; What does Boxford committee need to do?
Topsfield BtoB north project (Washington St to Boxford Town Line) – Joe Geller
Huber Law Firm’s report on Boxford deeds for abutters’ along the Boxford rail bed
Boxford BtoB south project (Pye Brook Lane to Topsfield Town Line) –status
Relate to BTA/BOLT’s Hemlock Junction trail project –
How will costs be met?
Bridge over Rte 95 status – Al Nirenberg
Triple event for ENHC T&S in Boxford: suggested dates: Sat 9/22 or 9/29, afternoon. deadline
BTA/BOLT – Hemlock Junction – Bay Circuit Trail- rail Trail connections
Boxford BtoB Committee answer questions: Connection with ECG, Rte 95 bridge, Kelsey Road X
HSB – Kelsey Arboretum – connecting Rail Trail on Kelsey Road X
Stantex Engineering - John Hendrickson, BtoB rail trail engineer
National Grid’s plans for building a new substation at a new location on Pond Street
FEDERAL B to B rail trail project’s plan for crossing Kelsey Road.
Merrimack Planning Commission & TIP funding – What does this committee need to do?