New exterior window casings on site to be installed
Detail of new exterior window casings with bead molding
Progress view from the northwest
New East Wall foundation at northeast corner
Ground blankets to protect footing excavations
New foundation at northeast corner of Multipurpose Room
Progress view from southeast
Substrate (processed gravel) at parking lot area looking east
Foundation wall of new Main Entry Vestibule
Foundation at shear wall between Kitchen and Multipurpose Room
East wall of Kitchen with sleeves for sanitary and grease trap pipes
West foundation wall of Kitchen
Typical top of foundation wall prior to rubbing