Old Storage Barn Removed
2. Siding at Cummings House gable walls removed; temporary construction fabric installed
3. Removal of siding at front (west) wall of Cummings House begins
4. Interior preparations to separate 1980 Addition from rear wall of Cummings house
5. Exposed rear wall of Cummings house with post & beam framing
6. Glass removal and preparations to demolish 1980 Library Addition
7. Asbestos floor tile removed (abated) from Library restrooms
8. Grubbing & clearing of brush begins
9. Haybales arrive on site to be installed at perimeter of work area
10. Removal of exterior sheathing reveals clean and dry (no mold) gypsum wallboard at Cummings House interior; Fiberglass batt insulation in wall to be removed to accommodate new blown-in insulation.